POINT OF SALER
November 2008
previous page
newsletter home | solutions|services
managed services
| company | contact

 
Retail Pro FAQ  
   

button Is Don Capman Retiring or
    Is He Repackaging?

by Debra Neville
Marketing Director, J.D. Associates

 

button Blacks Retail Economic Forecast
by Steve Pruitt
Senior Consultant, Blacks Consulting

 

button Where Does Shortage Come From
    and How Do I Control It?

by Jerry Obarski,
Retail Shrinkage Control Consultant

 

button Virtual Technician

 

button 500 words can earn you $500

 

button 15-Second Marketing Tip

 

button Did You Know?

 

button Retail Pro Webinar of the Month

 

button Retail Pro FAQ

 

retail_pro_logo


Scheduling Reports in Retail Pro

For Retail Pro V8 Users (Windows Reports)

With the use of the RPRO Scheduler, Retail Pro allows users to schedule Report Groups to run automatically. Follow the steps below to pre-schedule a report group to print or save automatically.

  1. From the main screen of Retail Pro Windows Reports:
    a. Click the REPORT GROUPS icon.
    b. Click the NEW button in the upper left.
    c. Name the report group and double-click on Reports from the appropriate tabs to be included in this report group.
    d. Select SAVE when finished.

  2. Once saved, take note of the column in Report Groups labeled FILE NAME The filename will usually be similar to 0000000#.RGP.

  3. Now, the RPRO Scheduler must be started and modified. From RPRO main screen:
    a. Select TOOLS and then SCHEDULER. A new icon should appear in your system tray at the bottom right of the screen.

  4. a. Double-click on the RPRO Scheduler to open the window.
    b. Select EDIT and ADD TASK from the top.

  5. a. In the top of the window that appears, give the task a name. Name the task reflective of what you’re scheduling (Weekly Reports, Monthly Reports, etc.)
    b. Select the RUN PROGRAM radio button from the left side.

  6. a. In the box to the right, labeled Program Name, type or use the folder browse button to find the REPORTS.exe program.
    b. In the box labeled Start In, click the browse folder to the right.
    c. Select OK. A typical BHD workstation will look as below.

  7. a. In Parameters, find the action that describes your desired action.
    b. Type the filename to the left of the desired action. NOTE: In place of 0000000#.rgp, type appropriate filename noted in Step 2.

  8. a. Select the SCHEDULE tab in the upper left of the screen.
    b. Select the appropriate date & time you want to schedule this report group to run. In this example, we want a report to run weekly at 6am.

  9. a. Select OK to close this scheduled task
    b. Select FILE and SAVE to save this
    scheduled task.
    c. Optionally, you may choose to select OPTIONS and then RUN ON STARTUP as well as MAKE CURRENT SCHEDULE DEFAULT.
ncr pos system hardware retail pro point of sale microsft pos system ibm pos system hardware

 

 
 

Published by J.D. Associates,
a division of Mander, Inc.
80 Erdman Way, Suite 300
Leominster, MA 01453

Phone: (978) 840-2096
Fax: (978) 840-2098
www.jdapos.com

 

President: don capman
don.capman@jdapos.com

Editor: debra neville
debra.neville@jdapos.com

Design: susan orareo
susan.orareo@jdapos.com

Archive: Missed an issue? View previous issues of the Point of Saler in our archive. [click here]